MXGFF
Maxim Power Corp., an independent power producer, engages in the development, ownership, and operation of power generation facilities in Canada. Its core asset is Milner 2 power plant, a 204 megawatt natural gas-fired turbine generator located in Grande Cache, Alberta. Maxim Power Corp. is headquartered in Calgary, Canada.
| Period | EPS | Revenue | FCF |
|---|---|---|---|
| 2026 Q1 | -0.00 | $16M | -$14M |
| 2025 Q4 | 0.04 | $14M | $8M |
| 2025 Q3 | 0.12 | $20M | $6M |
| 2025 Q2 | 0.01 | $21M | -$2M |
| 2025 Q1 | 0.05 | $20M | $3M |
| 2024 Q4 | -0.01 | $24M | $4M |
| 2024 Q3 | 0.23 | $26M | $11M |
| 2024 Q2 | 0.02 | $17M | $3M |